SmarterMRP takes the theoretical BOM from your ERP and generates the BOM of each order, with specific batches assigned and quantities adjusted to the parameter values of each batch.
The BOM of each order, with batches assigned by your plant's rules before production starts.
The ERP holds a theoretical BOM: one structure per product, the same for every order. It does not say which batches will cover a given order.
SmarterMRP reads available stock batch by batch, with the parameter values of each material, and applies your plant's rules: which batches go first, which substitutes are allowed, reuse criteria and compatible products.
The result is the BOM of the order, with batches assigned and quantities adjusted. The relation between the theoretical BOM and the assigned batches is recorded.
Each order gets its own BOM, with specific materials and batches assigned.
Take the theoretical BOM or formulation from master data, the same data the rest of the plan uses.
See available stock per batch, together with the parameter values of each material.
Set which batches go first, which substitutes are allowed, reuse criteria and compatible products.
Get each order's BOM with batches assigned and quantities adjusted, linked to its theoretical BOM.
SmarterMRP · BOM Manager
BOM Manager uses the same master data, requirements calculation and orders as the rest of SmarterMRP.
The exact relation between the theoretical BOM and the assigned batches is recorded for every order.
Dynamic product structures and formulations, with materials and batches assigned by rules, parameters or product properties.
Each order reaches the shop floor with its batches and quantities already set.
You know which batch covers which order before production starts.
Batches close to expiry and reusable material are allocated by rule.
Substitution and allocation criteria are applied the same way every time.
Production does not reinterpret the BOM or look for material at the last minute.
Built on Mendix: your plant’s rules become configuration, not custom code.
How the platform works →